I have read many threads related to this question but there some obscurity about how dry is dry enough. I have a 10 gallon with 35 lbs of "desert sand" from Lowes hardware moistened with a few cups of water then mixed it with a little bit of coco coir and 10lbs of excavator clay(dry) then I packed it by hand. Some people say to let it dry for 1-3 days and others say to let it dry completely. I have let it dry for 4 days now with a heat lamp on it and only the top half inch has actually become fully dry.
Is it ok for me to put him in now or should I wait until even the bottom of the substrate becomes dry?
Is it ok for me to put him in now or should I wait until even the bottom of the substrate becomes dry?